Specifications include, but are not limited to: • Furnish all labor, supervision, materials, and equipment to satisfactorily perform the demolition, deck repair/rebuild, new roof installation, and masonry wall repair as described in this Scope of Work during the times and at the frequency specified herein (the “Work”). Work is to be provided at our corporate offices in the Slade/Garr Building at 44 Washington Street in Providence. • Furnish all coordination, management, training, technical personnel, and special projects personnel as may be required during the term of the contract. These personnel shall be the direct agents and employees of the contractor, and may include, if required, a non-working resident supervisor who shall be the contractor's chief manager and agent in the performance of the services to be rendered hereunder. • Prohibit its employees from smoking and drinking alcoholic beverages in the buildings. Either activity will result in the employee’s immediate dismissal and termination from working in the buildings. • Instruct its personnel to go about their work in a quiet, professional manner, respectful of the rights of RIHousing and its employees to an orderly workplace free from disturbances. Profanity and obscenity will not be permitted. • Prohibit its employees from disturbing paper on desktops and other work surfaces, opening desk drawers and cabinets, or using telephones or other office equipment. • Ensure that all on-site personnel directly involved in performing the Work shall comply with the following requirements: Personnel shall be physically able to perform their assigned tasks and shall be free from any communicable disease. Personnel shall be capable employees, thoroughly trained and qualified to perform the work assigned to them. Personnel shall satisfy such security clearance as RIHousing may reasonably require. Upon arrival at the work site, Contractor shall provide, and personnel shall complete sign-in sheets for the Manager of Facilities Operations. Personnel shall report fires, hazardous conditions, and items in need of repair or replacement, including, but not limited to, lights, faucets, toilets, etc. Contractor shall provide a shift supervisor to oversee the work being completed. All work must be completed within 120 days of the contract award date (weather permitting).