Specifications include, but are not limited to: The work to be performed under this contract consists of furnishing all labor, skill, equipment, materials and products as indicated in the plans and specifications for the installation of a double barrel 7'x4' box culvert under Altama Avenue near at Suburban Drive and SPUR 25/Golden Isles Parkway to include road side piping and other drainage improvements at this location and to also install a triple barrel 10'x4' box culvert under Cypress Mill Road at the intersection of SPUR 25/Golden Isles Parkway and ditch grading and drainage improvements along approximately 5600 linear feet of existing ditch on the south side of SPUR 25 /Golden Isle Parkway as indicated in the construction plans and specifications attached herein. The work will contain, but is not limited to, traffic control to include lane closures, clearing and grubbing, borrow, grading, dewatering, backfilling , grassing, storm drain and box culvert installation, potential water and sewer relocations, base/paving, and erosion control.