Furnish all labor, materials, equipment, supplies, transportation, and disposal as necessary to complete the construction of the proposed project includes the construction of Loading Docks Improvements at Tenth Avenue Marine Terminal (TAMT), Warehouse B, in City of San Diego, CA. 2. Separate bid schedules have been provided to separate the work between the Western Loading Dock Improvements (BASE BID SCHEDULE), installation of a pre-fabricated metal staircase and associated work in lieu of construction of a concrete staircase (ADDITIVE BID SCHEDULE A) and the Eastern Loading Dock Improvements (ADDITIVE BID SCHEDULE B) at TAMT Warehouse B. 3. The Loading Dock Improvements at TAMT Warehouse B Project is located at the Tenth Avenue Marine Terminal (TAMT) in the City of San Diego. Located at the northern end of the Port of San Diego’s property is Warehouse B. The warehouse has loading dock platforms on both flanks of the structure; the western side (water side) and eastern side (land side). These loading docks have fundamental components that are well-past their useful lives and are in extremely poor condition. 4. The work shall include, but not limited to the following as shown in the Plans and described in these Specifications: a. Demolition of asphalt concrete pavement surface. b. Demolition of a reinforced concrete staircase with metal handrailing. c. Removal of wood, laminated rubber, and molded rubber bumpers. d. Demolition and removal of post-indicator valve (PIV) assemblies and associated piping and appurtenances. e. Installation of 8-inch Thick, Steel-Reinforced Portland Cement Concrete Pavement. f. Installation of reinforced concrete staircase with metal handrailing. g. Installation of Pre-Fabricated Metal Staircase. h. Installation of molded rubber bumpers or laminated rubber bumpers.