Specifications include, but are not limited to: 3.1. The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transportation, testing, reporting, and materials required to Demolish and remove existing structures (except red iron on center 60’ section; see drawings and demo notes on drawings), equipment, utilities, and materials. 3.2. Provide industry standard removal, clean up, repair, prep, install and construct new for: 3.2.1. Approximately 5,517 sq. ft. New Commercial Building (see detailed drawings and detailed notes on drawings). 3.2.2. Completely demo and remove existing structure, materials, equipment and haul off and dispose of properly. (Except for 60’ section of Red Iron, see demo sheet and notes.) 3.2.3. Bidder/Contractor shall carry, within Base Bid, hazardous materials abatement and disposal of the structures, footings, stem walls, site concrete and all other site appurtenances. Owner will perform all asbestos survey/testing. Results will be shared with the contractor and abatement/demo procedures will change, as necessary. Bidder shall be responsible for all utility disconnects prior to demolition Bidder/Contractor shall be responsible for submitting Official Notice to ODEQ a minimum of 10 days prior to demolition Bidder/Contractor shall be responsible for all waste disposals. No on-site dumping, burying, burning, or stockpiling will be allowed Bidder/Contractor shall be responsible for all asbestos abatement and lead base paint recovery, as stipulated by the governing association Bidder/Contractor shall leave the site smooth and dressed without depressions, holes, windrows, rocks, concrete, debris, or other materials resulting from demolition Bidder/Contractor shall submit copies of all local, state, and federal documentation to the Cherokee Nation with Final Pay application Bidder/Contractor shall pump and remove existing septic systems, including the tank and inlet lines 3.3. Contractor will utilize dust prevention methods to keep dust and flying debris to a minimum as well as preventing possibility of fires while demolishing existing structures.