73,670 SQ FT OF 5-FOOT-WIDE TRAIL PAVING (ADVISE TO TAKE OWN MEASUREMENTS) 73,670 SQ FT OF ALL EXISTING CART PATHS TO BE MILLED UP COMPLETELY AND REPLACED, MILLINGS CAN BE USED WITH AGGREGATE TO CREATE THE NEW SUBBASE LAYER FOR PATHWAYS. **AFTER CART PATHS ARE MILLED TO SUBBASE THE GROUND SHOULD BE INSPECTED TO DETERMINE NEW SUBGRADE COMPACTED THICKNESS. ** SUBBASE TO BE SPRAYED WITH HERBICIDE TO PREVENT ANY NEW GROWTH. SUBGRADE SHOULD BE GRADED, COMPACTED AND HAVE A PRIMECOAT APPLIED PRIOR TO ASPHALT LAYER INSTALLATION. ALL GROUND IMPERFECTIONS TO BE REPAIRED OR REMOVED PRIOR TO SUBGRADE INSTALLATION WHICH INCLUDES, (I.E. HOLES, WATER EROSION, TREE ROOTS, VEGETATION, TOPSOIL, ROCKS AND SO ON). ALL DRAINAGE PIPIES THAT ARE DAMAGED WILL NEED TO BE REPLACED BEFORE ASPHALT INSTALLATION. SLEEVES UNDER THE CART PATHS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION WHERE NEEDED. ALL APPROACHES TO BRIDGES, CURBING, SIDEWALKS AND SOFORTH ARE TO BE LEVEL AND MAKE A SMOOTH TRANSITION WITH THE NEW ASPHALT INSTALLATION. INSTALLING OF NO LESS THAN 3” OF FULLY COMPACTED ASPHALT OVER NEWLY PREPPED SUBGRADE. **NEW CART PATHS ARE TO BE NO LESS THAN 5 FOOT WIDE.** AT ALL TEE BOXES THERE WILL BE AN 8’ BY 12’ EGRESS FOR CARTS TO STOP AND BYPASS EACHOTHER DURING PLAY. BACKFILL WITH APPROVED SOIL TO ENSURE THERE NO DROP OFF IN EXCESS OF 2” ON THE SIDES OF THE PATHS TEMPERATURE MUST BE 50 DEGREES AND RISING DURING THE LAY DOWN OF THE NEW ASPHALT. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAMGES THAT MIGHT INCCUR DURING THIS PROJECT. (I.E IRRIGATION, WIRING DRAINAGE PIPES AND SO ON) CLEAN UP JOBSITE TO THE APPROVAL OF THE SITE REPRESENTATIVE (GOLF COURSE SUPERINTENDENT), BEFORE TOTAL COMPLETION IS ACHIEVED 1-YEAR UNCONDITIONAL WARRANTY FOR REPAIRS TO FAULTY LAYMENT OR CRACKING. NOTES: A FULLY DETAILED SITE VISIT IS HIGHLY RECCOMMENDED FOR THIS PROJECT