Specifications include, but are not limited to: 1. Provide complete survey services of the KOA campsites, the pathway to the lift station, and all areas of anticipated excavation. 2. Provide complete engineering and drawing services to replace the existing gravity sewer infrastructure at each campsite and building with new tie-ins, new lateral lines, new mains, new lift station, and new forced main. 3. Engineering firm shall produce new plans reflecting the sewer changes; this shall include single-line drawings, flow sections, equipment schedule, etc. 4. Engineering firm shall design a new, gravity sewer system in complete compliance with local jurisdiction, county and state jurisdictions. Engineering firm shall provide required specifications and drawings for bidding and record purposes. 5. Engineering firm shall design/engineer new electrical panels, and transformers as may be required for the new lift station. 6. All drawings and specifications shall be stamped by a professional engineer registered in the state of Oklahoma and be suitable for bidding purposes. 7. All drawings and specifications shall be issued with the standard degree of care as prescribed in the industry. 8. Engineering firm shall include site visits necessary to fulfill the scope of the work. 9. Engineering firm shall be responsible for shop drawing and submittal review. 10. Engineering firm shall provide construction administration services during the installation of the work. 11. In addition to a base proposal for services, engineering firm shall submittal a rate schedule for add services and reimbursables. 12. All engineering shall be in compliance with IBC, IPC, NEC, IMC, ASHRAE, NFPA, Model Energy Code, and other relevant codes as currently adopted by the State of Oklahoma. 13. Engineering firm shall submit complete drawing package to local jurisdiction for plan review, Oklahoma Department of Environmental Quality, and others as may be required. 14. Reference attached aerial image of the work area.