Specifications include, but are not limited to: Demolition: The contractor is responsible for securing the necessary dumpsters and all waste removal. Wall: Walls are to 5/8” drywall over 4” metal studs with 4” black cove base, and painted, all to match existing. Batt insulation shall be used in walls of the three offices in the Parking Operations Center. Ceiling: The ceiling is comprised of a 2’x4’ drop ceiling. The drop ceiling lights, returns, and diffusers will need to be relocated to accommodate the changes as shown on the floor plans. Additional lights, returns, and diffusers may be needed. Each room must have its own light switch to control the lights located in that room. Floors: The floor finishes are carpet tiles and vinyl composite tiles. The floor plan indicates the approximate location where the carpet tiles and viny composite tiles remain and where new is required. New carpet tiles shall be 24”x24” Mohawk Aladdin Breaking News 2B178 heavy traffic commercial carpet squares (or equal) (color “On Demand 078”) to match the existing and laid in a checkboard pattern. New vinyl composite tiles shall match the existing and laid in a checkboard pattern. HVAC: As shown on the plans, HVAC Zone 1 will be increased by approximately 680 SF and HVAC Zone 2 will be reduced in area by approximately 680 SF. The systems will need to be rebalanced to accommodate this change. Ductwork will need to be modified.