Specifications include, but are not limited to: Demo: Demolish and remove items as shown on plans L 1.00 from the site signage drawings from Alaback Design dated 5/30/24. Coordinate as needed with owner. Notify Cultural Tourism personnel in the office building prior to beginning work. As shown on plan, remove the existing concrete slab (10 x10) and any gravel subbase that may be present. Remove ground concrete footing in the southeast corner of the slab where a flagpole has been removed. Remove the existing metal sign frame (6 x 6), remove the existing light fixture in the slab. (Provide a junction box at the existing electrical supply line, stubbed above ground so that the power supply can be used for the new signage lighting. Legally dispose of all the demolished materials off site. After all demo has been completed, add topsoil as needed to bring the demolition site up to match adjacent grades. Signage: Contractor to provide 2 new signs per finish and specifications on Alaback Design drawing L1.00 dated 5/30/24. The 2 new signs are aluminum framed signs with a masonry base. (see drawing sht. L1.00 for details.). For each sign location, the masonry bases, footings (designed by Sign Fabricator), and signage panels are to be installed by the Signage Fabrication Company. Layout signs in field per plans. Receive prior approval from owner for final signage locations and orientation before beginning installation of work. Lettering details and font design on signs see Drawing Elevation C on drawing sht. L1.00. Masonry: Stone Masonry base to match Cultural Pathway. Cultural Stone – www.impressionsinstone.Biz Stone Style: Hackett. Color: Los Lagos Electrical: Contractor to remove the existing light fixture in the slab. (Provide a junction box at the existing electrical supply line, stubbed above ground so that the power supply can be used for the new signage lighting. (New lighting fixture and installation by owner).