Specifications include, but are not limited to: completing Phase 3: C8 and C9 Sewer Rehabilitation and I/I Removal including cured-in-place pipe lining (CIPPL) of approximately 23,500 LF of 8" to 12" diameter mainline sewers, point repairs on eleven mainline sewers, removal of six protruding taps within mainline sewers, pre-cleaning, pre and post closed-circuit television inspections, CIPPL of 539 sewer service laterals, service lateral point repairs on 45 service laterals, replacement of 88 service laterals, heavy cleaning for service laterals and mainline sewers, sidewalk, curbing, paving, private inflow disconnection at 89 locations, installation of 3,000 feet of storm drains, and sewer manhole lining and/or rehabilitation on 114 manholes.