Specifications include, but are not limited to: 1. The contractor shall install four (4) Dual-Port, Level 2 Charging Stations. Conduits shall lay as described on the pictures in that manual. All Charger will be pedestal mounted. 2. The contractor shall install one (1) 225 Amps 3 Pole 480V Circuit Breaker into the existing 600 Amps Electrical Panel according to NEC. This 225 Amps circuit breaker has to have the same short circuit interrupting capacity as the existing circuit breakers which are at the electrical panel. 3. The contractor shall install 400 Amps, 480V, 3 Pole, Fusible, Enclosed, Heavy Duty Disconnect Switch before the 150 kVA transformer. The disconnect switch shall have 3 fuses rated at 225 Amps, 480V, 200 kA RMS symmetrical. 4. The contractor shall install one (1) 150 kVA, 480V/208V, 3 phase, copper core transformer. Transformer must be a minimum Nema 3R Protective class. The contractor shall install a concrete pad for the electrical cabinet 5. The contractor shall install one (1) 600 A, 208V, 3 phase EV Panel for 4 Level 2 Chargers. Electrical Panel must be the minimum Nema 3R Protective class. It must be lockable and waterproof. The contractor shall install a concrete pad for the electrical cabinet. The 600 Amps panel shall include twelve (12) 60 Amps, 2 Pole 22kA circuit breakers...