Specifications include, but are not limited to: A. The work required by these specifications shall include furnishing all labor, skill, supervision, tools, construction plant, equipment, and materials, and performing all operations to properly complete contract work as shown on the Drawings, as mentioned in these specifications, and as evidently required, to the complete satisfaction of the Owner and the Engineer. B. The Contractor is responsible for updating and/or filing any Local, State, and/or Federal permits to complete construction. C. The following summary of work is intended to be general in nature and shall not be considered direction by the Engineer or the Owner. Although it is likely that some of the work items will overlap, construction sequences, phases, and order for the various project components are described separately and may not necessarily proceed in the order presented. The work on the project includes but is not limited to: 1. Mobilize to the project site; establish site access and staging areas. 2. Expose, and repair spall areas 3. Provide selective demolition, surface preparation, surface repair and new coatings, 4. Remove and re-cast headers 5. Abrasively clean all existing hinges and cost with epoxy paint. 6. Remove and reset louvers and screens for repairs; scape and pain screens; provide new backer rod and sealant 7. Remove and reset HVAC equipment as required.