Specifications include, but are not limited to: Task 1 – Preliminary Site Investigation: 1. Desktop Review – Will obtain and review the following data: a. As-Builts / Record Drawings. b. City / County GIS. c. Easement Plats d. Ownership Records; 2. Site Data Collection –Will obtain and review the following on-site information: a. Site layout measurements. b. Measurement of site components and structures. c. Verification of desktop review findings. d. Limited electrical investigation of existing breaker panels. Task 2 – Design: 1. Design Submittal – For review, following preliminary site investigations the awarded firm will furnish drawings that will include the following: a. Approximate existing site conditions based upon site data collection. b. Preliminary proposed MAG meter vault locations. c. Summary of existing breaker panels and available spare breakers. d. Proposed electrical appurtenances. e. Misc. yard piping modifications...