Specifications include, but are not limited to: INSTALLATION A. Epoxy Bonding Agent Extended Open Time: 1. In strict accordance with manufacturer’s recommendations, mix and apply epoxy bonding agent to all areas as indicated on Drawings. 2. Allow epoxy bonding agent to dry a minimum 2 hours, but no more than the Manufacturer’s recommended open time prior to placing repair mortar. B. Bonding Grout: 1. Mix bonding grout and scrub into SSD repair substrate with a stiff broom to all areas as indicated on Drawings. 2. Place repair material prior to initial set of grout. If grout sets prior to placement of repair material, complete remove grout from surface and re-clean prior to proceeding with new grout placement and repair mortar. C. Mortar Placement: Mortar materials shall be placed in strict accordance with manufacturer's instructions. Properly proportioned and mixed mortar material shall be placed using tools to consolidate mortar so that no voids exist within new material and continuous contact with base concrete is achieved. D. Form and Pour Repair Mortar Placement: Mix and apply in strict accordance with manufacturer’s written instructions, to achieve a maximum 9” slump. Consolidate mortar so that no voids exist and continuous contact with base concrete is achieved.