Specifications include, but are not limited to: Installation of energy-efficiency exterior window film, and caulking of various window sections in Chippens Hill Middle School, 551 Peacedale Street, Bristol, CT 06010, as noted below. Tower A: 1. Installation of window film on 1/4” glass panels double pane, sized 38” x 38” Ea 191. 2. Window caulking at Tower A L F 2,500. Tower B: 3. Installation of window film on 1/4” glass panels double pane, sized 38” x 38” Ea 191. 4. Window caulking at Tower B L F 2,500. Third Floor: 5. Installation of window film on 1/4” glass panels double pane, sized 30” x 30” Ea 116. 6. Window caulking at 3rd Floor classrooms L F 1,200. Product shall be Vista window film VXA14 EH HPR by Llumar Atmosphere exterior series, or approved equivalent. The Bristol Board of Education (“BOE”) shall be the sole judge in determining functional acceptability of equipment, based on its ability to meet the operational needs of the BOE. All work must be completed no later than September 30, 2024.