Specifications include, but are not limited to: The City owns and maintains the Poplar Creek Golf Course which is located at 1700 Coyote Point Drive, San Mateo. There are two existing irrigation wells located near the southwest corner of the property, one currently in use and one that is out of service (see Appendix A for location map). The City is looking to abandon the out of service well in compliance with San Mateo County Environmental Health Services requirements, and construct a new irrigation well approximately 40 feet west of the abandoned, out-ofservice well. It is desired that the new irrigation well has similar or better production of the existing well that is still currently in use. The existing well currently in use will remain as-is and will service as a backup water source after the new replacement well is placed in service. The proposer will need to: • Perform a hydrogeologic study, test/pilot hole drilling, and any other services necessary to identify the optimal location to construct the new well. • Provide services for the construction of the new irrigation well. • Install below-ground infrastructure including the pump and pipe. • Design above-ground conveyance infrastructure between the well and holding pond (to be installed under a separate contract). • Provide services for well destruction of the abandoned, out-of-service well. The scope of work for this contract will vary as the need arises and will be at the discretion of the City. The main categories of work may include but are not limited to • Project Management, Coordination, and Permitting • Site Investigation and Test Well Drilling/Analysis • New Irrigation Well and Well Pump • Design of Above-Ground Conveyance Infrastructure from Well to Pond • Well Destruction of Abandoned, Out-Of-Service Well and Associated Permitting • Optional Task for Existing Well Investigation and Development of a Well Rehabilitation Plan