Specifications include, but are not limited to: Office 307Q - Contractor shall remove trim on top of existing wall. Contractor shall build knee wall approximately 1’-3” high x 26’ long on top of existing stud wall. Knee wall shall terminate on the underside of grid ceiling. Contractor shall relocate one sprinkler head to the inside of the new office (Between 307Q/307T to 307T). Contractor shall install 5/8” sheetrock on knee wall, two sides. Contractor shall prep and paint new sheetrock on knee wall, two sides, and two existing walls, one side. New color shall match existing, Sherwin Williams light grey or equal. Contractor shall relocate two supply grilles to accommodate new offices (Between 307Q/R to 307Q). Office 307R - Contractor shall remove trim on top of existing wall. Contractor shall build knee wall approximately 1’-3” high x 10’ long on top of existing stud wall. Knee wall shall terminate on the underside of ceiling grid. Contractor shall relocate one sprinkler head to the inside of the new office (Between 307R/S to 307S). Contractor shall install 5/8” sheetrock on knee wall, two sides. Contractor shall prep and paint new sheetrock on knee wall, two sides, and two existing walls, one side. New color shall match existing, light grey. Contractor shall relocate two lay-in light fixtures to accommodate new office (Between 307Q/R to 307R). Contractor shall relocate two supply grilles to accommodate new offices (Between 307R/S to 307R)...