Specifications include, but are not limited to: 1. Prepare a master schedule for each project, including planning activities, design, right of way/easement acquisition, and construction phases. The master schedule will be updated as needed throughout the projects. Provide the Parish acceptable design submittals for review (the Parish Administration will be part of the project conceptual phase; the project team must receive approval in this regard prior to proceeding with 30%, 60%, 90%, and 100% submittals). The same administrative approvals will be needed for each project milestone. 2. Designing levees, earthen embankments, floodwalls, drainage structures, channels, flap gates, stop logs, pump stations, and construction engineering. 3. Assisting the administrative consultant with the construction bid package in conformance with applicable federal requirements and supervising the bid advertising, tabulation, and award process, including preparing the advertisements for bid solicitation, conducting the bid opening, and issuing the notice to proceed. 4. Assist in conducting the preconstruction conference. 5. Field staking, on-site supervision of construction work, and preparing inspection reports. 6. Reviewing and approving all contractor requests for payment and submitting approved requests to the governing body. 7. Providing reproducible plan drawings to the Parish upon project completion. 8. Prepare operating and maintenance manuals. 9. Conducting final inspection and testing. 10. Assist in the completion of NEPA Environmental Assessments, and Benefit Cost Analyses to include benefits before and after mitigation.