Specifications include, but are not limited to: Sewer Work includes, but is not limited to: 1. Mobilization and demobilization work; 2. Traffic control work; 3. Trench and excavation support work; 4. Constructing 8-inch, 10-inch, 12-inch, 15-inch, and 18-inch diameter bell and spigot type vitrified clay extra strength pipe (VCP) on crushed rock bedding wrapped in geotextile fabric; 5. Lining existing 8-inch, 12-inch, 15-inch, 16-inch, 18-inch, 21-inch, 24- inch diameter VCP and ISP main sewers with cured-in-place liner (CIPL); 6. Cleanly cut and remove segments of side sewer or culvert flush with the inner wall of sewer main and other obstructions requiring internal reaming prior to the sewer rehabilitation work; 7. Installing 8-inch, 10-inch, 12-inch, 14-inch, 15-inch, 16-inch, 18-inch, 21- inch, and 24-inch sectional spot liners in existing sewers; 8. Installing ultraviolet (UV) cured liner saddle side sewer (lateral) connections; 9. Internally or externally reinstate lateral connections to newly lined main sewer; 10. Televising main sewer prior to sewer work to confirm locations of lateral connections and identify defects requiring spot repair; 11. Bypassing main sewer and side sewer (lateral) flow as required; 12. Installing new concrete manholes with frame and cover; 13. Cleaning and mortaring existing brick manholes, as shown on the plans; 14. Supporting, working around, and protecting government-owned and nongovernment-owned facilities in conjunction with the work in this contract; 15. Mitigate potential public complaints or exposure during cured-in-place liner (CIPL) installation process...