Specifications include, but are not limited to: Scope of work to primarily include the following for Phase 1: Installation of a new lime feed system and silo procured from RDP Technologies. Modifications at the SCU walkways and platforms to accommodate the lime feed loop and dosing stations. Sitework, electrical, and ancillary items associated with the installation of the lime feed system. Scope of work to primarily include the following for Phase 2: Modifications to existing chlorine feed storage and feed system, monorail structure, and wall within Chemical Building 01. Demolition and decommissioning of existing aqueous ammonia storage and feed system. Construction of Chemical Building 02 with sodium hydroxide, sodium hexametaphosphate, and liquid ammonium sulfate chemical storage and feed systems along with associated mechanical and electrical rooms. Construction of Booster Pump Building including skidded booster pumps for use in lime, carbon dioxide, and chlorine chemical feed systems as well as a skidded fire booster pump to serve Chemical Building 01...