Provide all parts, materials and labor to construct a functioning fuel station. • 12,000 gal Highland fire guard tank, spilt 8000 diesel 4000 gas 10' dia. Green in color. • 2- Wayne stainless steel product dispensers located at either end of tank slab with provisions for getting aboveground piping into dispensers for startup. • 4 - sets of hoses- breakaways, swivels, handles and hangers • 8" Sch 40 galvanized, with yellow sleeves bolted to fueling pad with hot dipped galv anchors epoxied into slab at 48" o.c. at front and sides of tank. • Submersible pumps for both diesel and gas with all controls. • New tank top equipment including Solenoid valves, thermal shutoff values, emergency vents, overfill protection valves, and breathers. • New Veeder root TLS 4 Plus with product probes and interstitial sensors and start up. • GIR fuel management system, cloud based with 5 years of service included, with startup. Single pedestal mounted keypad, located at center of tank. • All new conduits from fuel island to existing building to be routed around future DPW building location and limits of work