Specifications include, but are not limited to: The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above-stated project. The general items of work to be done hereunder consist of: Removals and relocations, excavation and fill operations, erosion control measures, traffic control measures, adjustments to grade, construction of curb, gutter, sidewalk, concrete cross gutter, parkway culvert, aggregate base, asphalt paving, asphalt grinding and overlay, water relocations, removal and reconstruction of pressure reducing station, entry monument relocation, street light relocations, Filterra Unit BMP and storm drain connections thereto, traffic signal modification, traffic signing and striping, and other ancillary works on Murrieta Hot Springs Road and Alta Murrieta Drive, all as shown on the Plans, Standard Plans, and as specified in the Bid Specifications.