Replace faulty 6” butterfly valve on coin vault dry system and rewire tamper. Pull four (4) dry pendants by fire pump room that are due for UL testing, Send off dry pendants for UL testing and replace them with new dry pendants. Replace inoperable accelerator on outdoor barn dry system. Repair clogged inspector’s test on bus wash dry system. Repair clogged inspector’s test on coin vault dry system. 1 Fire Pump Repairs Pull pump cover off fire pump. Pull existing packing, swing bolts, and gasket. Replace packing, swing bolts, and gasket. Install cover back on fire pump. Start pump and adjust packing as needed. 1 Dry Valve Changeout and System Repairs Replace damaged 6” dry valve that is out of service and red tagged. Replace 1” piping and horizontal sidewall under bay door. Replace damaged arm over at last bay. Setup dry system and put back in service.