Specifications include, but are not limited to: urnish and install all materials and labor for the completion of the Base Bid Improvements. Mobilization; Site Grading and Earthwork; Aggregate Base Course, Access Road; Onsite Water Treatment System. The following descriptions delineate the Work, materials, and how measurements of completed Work will be made and paid for, for each bid item in the Bid Schedule. The Bidder is to read these definitions and price their proposal accordingly. Bid Item 1 – Mobilization Measurement and payment for mobilization will be in accordance with SECTION 02050 – MOBILIZATION. Bid Item 2 – Site Grading and Earthwork This bid item includes all labor, materials, equipment, independent testing services, and incidental costs required to perform earthwork in accordance with these bid documents. This includes but is not limited to: any costs for preparatory earthwork, clearing and grubbing, access road scarification, excavation, backfill, compaction, soil testing, and finish grading. items shall not be measured separately but shall be included in the total unit cost. Payment will be made at the lump sum bid price as reported on the Bid Schedule. Bid Item 3 – Aggregate Base Course, Access Road This bid item includes all labor, materials, equipment, independent testing services, and incidental costs required to furnish and place CDOT Class 6 Aggregate Base Course (ABC) for the access road in accordance with these bid documents. ABC shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be according to load tickets delivered to the site, and paid at the unit price per ton as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application. Bid Item 4 – Residence Foundation This bid item includes all design, labor, materials, equipment, independent testing services, and incidental costs associated with the complete foundation design and installation in accordance with these bid documents. This bid item consists of all load bearing components, foundation walls, lateral bracing, ventilation, and crawlspace access. It also includes all required structural excavations including pier or pile installation, footing excavation, overexcavation and furnishing and placement of structural fill, backfill, compaction, testing and observation as appropriate for the approved design. This pay item includes but is not limited to: earthwork, dewatering, formwork, void form placement, reinforcing steel fabrication, inserts and fastening devices, concrete placement, and all other supplies necessary for the complete installation. Individual items shall not be measured separately but shall be included in the total unit cost. Payment will be made at the lump sum bid price as reported on the Bid Schedule.