Specifications include, but are not limited to: Remove and excavate existing road verge and sidewalk from the 1600 block of 19th street between Oak Street and Plum Street one side at a time. Pedestrian traffic shall be detoured to the other side of the road while under construction and two-way vehicular traffic always maintained to the minimum extent possible. Removal of road verge will serve as additional space for on street parking. Concrete shall be placed from the face of existing curb line to the face of the proposed curb line. Additionally, sidewalk and curb construction shall follow the typical section and drawings provided. To avoid relocating utility poles, the contractor shall construct a wider sidewalk area as detailed in the drawings. Water valves and meters that need adjusted within project limits shall be coordinated with the Parkersburg Utility Board. Driveway access is to only be blocked for short durations and temporary stone shall be placed at the completion of each construction day to avoid accessibility issues. If possible, driveway construction shall be done in parts. All gas valve or meter adjustments if any shall be coordinated with Hope Gas.