Specifications include, but are not limited to: Phase 1: Portland Cement Concrete (PCC) removals and replacement of concrete improvements. o Driveways: Access shall be maintained at the end of each working day. Replacement of driveway improvements (PCC Pavement within public right of way) shall occur within 5 working days of the removals and shall not remain open over a weekend. Plating of driveways at the end of each working day will be required to allow access. Replacement of additional private improvements (AC, PCC, Fence, Decorative Paving, Etc.) shall be allowed to extend an additional 5working days beyond the driveway replacements, however, the contractor shall be responsible for installing and maintaining any necessary temporary access, ramping, and plating to allow access to the residents throughout the working period. o Sidewalk, Curbs, & Curb Ramps: Replacement of sidewalk and curb ramps shall occur within 5 working days of the removals and shall not remain open over a weekend. Pedestrian traffic control shall be installed by the contractor to maintain the path of travel. o Cross gutters: Contractor shall maintain access at all intersections during the course of construction and shall phase the construction of cross gutters at each intersection. Plating of the cross gutter will be required during curing period as part of the assumed unit pricing. Cross gutters must be completed within 5 working days of starting demolition of the given cross gutter and shall not be left open over the weekend....