Specifications include, but are not limited to: Chassis and Engine 1. Unit must be a 2014 or newer with less than 100,000 miles and fewer than 8000 hrs. 2. Chassis engine must be at least 250 hp. – DT 466 or equal. 3. Transmission shall be Allison Automatic MD3060P or equal. 4. Unit must have Air Brakes 5. 41,000 GVW – 18,000 lb. Front Axle and 23,000 lb. Rear Axle 6. Front Tires shall be 385/65 R22.5 – NEW 7. Rear Tires shall be 11R 22.5 – NEW 8. Tow Hooks front and rear. 9. Minimum 90-day catastrophic failure warranty; Combination Sewer Cleaner 1. Unit must have a new or rebuilt single piston dual action water pump specifically designed for the sewer cleaning industry. Pump must have the capability to run dry for 30 minutes to allow for clearing water system during cold weather operations. 2. No triplex pumps will be accepted. 3. Unit must have aluminum water tanks with a minimum capacity of 1000 gallons for sewer jetting operations. 4. Water system must be capable of producing no less than 80-gpm at 2000 psi. 5. Water system must have a cold weather recirculation system. 6. Telescoping/rotating hose reel and will be filled with a minimum of 600’ feet of NEW Sewer Rodding Hose. 2500 psi x 1”. 7. Hose reel shall have a dual roller wind guide. 8. Unit shall have a mid-ship hand gun coupling. 9. Debris body shall be minimum 5 cu. yd. capacity with a dual stainless steel float ball system and dual inlet ports for material separation. 10. Debris body shall have a domed or flat rear door with hydraulic locks. 11. Debris body shall have a minimum 60-gpm body flush-out system to facilitate cleaning of debris body. 12. Air conveyance into the debris body shall be accomplished using a Dual 2 Stage Fan system. 13. Boom shall be minimum of 4-foot Hydraulic Telescoping. 14. Unit shall have Strobe Lights on the Front and Rear of unit for safety. 15. Unit shall be white in color with a paint job clear of any defects. 16. Units Debris Body shall have been sand blasted and coated to protect from rust. 17. Unit Debris Body shall have new stainless steel float balls and cages. 18. Unit will have a new set of 8” Aluminum Vac Pipe and new clamps to go minimum 19.5 feet deep. 19. Unit shall have clean and functional Reel Rotation bearing. 20. Unit Hose Reel frame shall have New Telescoping frame wear pads. 21. Unit shall have resealed dump control valve and door lock valve. 22. Unit shall have new or resealed Debris Body dump cylinder and a door lock cylinder. 23. Unit shall have an outer boom suction tube and seal, that are fully functioning and free of major defects. 24. Unit shall have a new Debris Body rear door seal. 25. Unit will have all-new Rubber hoses that pertain to the debris suction system. 26. Unit shall have new decant hose and couplings. 27. Unit shall have a 1” Jetting Nozzle Assortment to include at least: 1 New Penetrating Nozzle, Controlled Rotation Nozzle, and Cleaning Nozzle jetted to the correct GPM and PSI for the machine water pump. 28. Unit Shall have an assortment of Hydro-excavation nozzles to include at least: 1 New Single Blade Nozzle, Dual Blade Nozzle, and Ripsaw nozzle jetted to the correct GPM and PSI of Hydroex system on machine. 29. Unit shall have a new Tiger Tail w/rope and a new upper manhole roller to protect sewer hose. 30. Unit shall have new wash-down gun and minimum 50 ft. of ½ inch high-pressure hose. 31. Unit shall be Hydro excavation capable. 32. Vacuum system shall have an 8” to 4” reducer fitting. 33. Vacuum, jetting and hydro excavation systems shall have a minimum of 1 year warranty. 34. Unit shall be delivered no more than 120 days after the order is placed. Bid proposal should include cost of delivery.