Specifications include, but are not limited to: The Base project includes furnishing and installing DOAS-1, ACCU-2, ACCU-3, and all associated indoor VRF units serving second and third floors. Work to include but not limited to, providing all associated equipment, ductwork, piping, controls, structure, electrical, architectural and components necessary for a fully functioning system. Cap DOAS-1 duct mains in first floor ceiling for future connection. Valve and cap DOAS-2 hot water mains in first floor ceiling for future connection. Perform unit ventilator demolition work and replacement with finned tube radiation in rooms being served by DOAS-1 on second and third floors. Provide all electrical work to support mechanical upgrades including replacing MMC-4 with new panel board and migrating existing electrical loads. When replacing MCC, the existing exhaust fans remaining in service shall be provided with motor starters and mechanical time clocks. Contractor to verify power requirements to match. There are seven fans on the 1970 roof. Refer to dwg M4.1 for building references and locations. MC to furnish motor starters, time clocks and control...