Specifications include, but are not limited to: Provide all materials, equipment, and manpower necessary to deliver complete project per SOW, documents, details, and notes on details. Please provide bid for Asphalt, (Standard Duty) and or Concrete, Light Duty, broom finish perpendicular to traffic) per attached details. Width shall be eight foot wide (8'). Also there is a parking area in the north east corner that is 44'x100' with an adjoining sidewalk to the Walking Trail and a drive that shall be included. Make a smooth transition from asphalt road that is existing. All pavements shall be ADA compliant. Provide a minimum of 4" of topsoil on shoulders 4' out, then feathered out to existing grade around entire walking trail and parking area. Provide 4' of Bermuda sod on each side and around parking area. Sid shall be in good condition and sufficiently watered a minimum of twice a week for 4 weeks. If work is not completed the week before and the day of Labor Day, contractor shall move equipment to an area by Facilities Shop building, (which is in close proximity of project) and make site ready for the Cherokee National Holiday. Any unfinished work can commence again after Labor Day.