Work includes, but is not limited to topsoil removal, shaping, fabric, class 5, bituminous, concrete, and stripping. 1. New Parking Lot to be existing lot, plus current concrete area (not including stoop under canopy), plus small additional expansions. See sketch for dimensions. 2. All existing Bituminous to be removed and repaved as follows: 3. Provide and install Type V geotextile fabric. 4. Subcut, provide and install 4 inches of additional Class V base 5. Provide and install 2.0” deep Non-wearing course 6. Provide and install tack coat. 7. Provide and install 1.5” Wearing Course. 8. Expansion area. 2 areas: 1st area is 20ft x 35ft 2nd area is 75 ft x 28ft and tapers to 20ft a. Sub cut existing areas b. Provide and install 4 “deep class 5 aggregate base. Base to be 2ft wider than bituminous perimeter 9. Existing concrete under entry canopy to be removed and new concrete poured and broom finished. 10. Existing concrete sidewalk adjacent to canopy to be removed and replaced with bituminous. 11. Strip lot to maximize number of parking stalls 12. Van accessible Handicap parking spot to be provided to left of front entry door. 13. Access route to building that is ADA compliant is required from Handicap spot to building. 14. Shoulder and seed perimeter.