Specifications include, but are not limited to: The following specifications are minimum acceptable requirements. The bidder may offer an alternate product believed to be an equal. Any alternate product(s) bid must be clearly identified by manufacturer and catalog, model or stock number. Adequate detailed specifications of the product offered must be included with your bid to establish equivalency and to ensure that the product being bid meets all specifications. Failure to provide product specifications and information may disqualify your bid. The contractor shall be responsible for verifying any additional needed information during the mandatory site visit. Bid specifications may not be revised without an official written addendum issued by the Town of Durham. Removal of old and installation of new roofing system on Town Owned Barn referred to as Deerfield Farm, 337 Parmelee Hill Road, Durham, CT. • Contractor shall provide all labor and materials to complete all work in accordance with Federal, State and Local laws, codes, ordinances and manufacturer’s specifications. • Contractor shall remove existing roofing system and all construction debris to be disposed of properly. • Contractor must verify all measurements. • Contractor shall schedule work in order to minimize disruption of the operations and take measures to keep the building watertight during the project work. • All outside and inside areas of the building and the grounds shall remain clean and free of any construction debris. An allotted area will be allowed for material