Specifications include, but are not limited to: A. The Contractor shall provide all labor, hazardous materials sampling, hazardous materials testing, fees, inspections, certifications, services, equipment, materials, obtain permits, and supplies necessary to demolish the structure on Subject Property. B. The Contractor shall maintain the structural integrity of the existing ‘A-Frame’ supporting the cafeteria. Structural foundation, floor slab, and structural steel frame, including steel columns and primary structural steel trusses, for the area beginning at the southwest corner of the structure, extending approximately 35’4f”t to the east and 60’8” ft to the north. Walls, roofing, and flooring on and within the ‘A-frame’ should be carefully removed. C. The Contractor is to partially demolish existing structure, basement, and footings. The Contractor is to fill the basement area with suitable soil. Concrete blocks, masonry, or other rubble from the demolished structures or any organic materials may not be used as fill. All foundation/concrete must be completely removed. All basement or other depressions, holes, or excavations, or ruts shall be cleared of all debris before filling operations are undertaken and the floors of basements, wells, cisterns, septic tanks and laterals or similar installations shall be removed or disposed of pursuant to Jefferson County Department of Health permit instructions.