Specifications include, but are not limited to: Installation of approximately 2,670 linear feet (LF) of gravity sewer pipe in various diameters: 8-inch diameter pipe 12-inch diameter pipe 15-inch diameter pipe Construction of 14 precast concrete manholes. Installation of a 24-inch steel casing using jack and bore method to cross under the Georgia Department of Transportation (GDOT) right-of-way without disrupting traffic. Demolition of two existing lift stations Removal and replacement of existing pavement sections impacted by construction activities. Installation of a new asphaltic concrete overlay along Ramble Road. Installation of three grinder pump systems to collect wastewater from areas with limited gravity flow. Installation of approximately 400 LF of 2-inch diameter low-pressure force main to convey wastewater from the grinder pumps to the gravity sewer system. Miscellaneous task such as excavation, backfilling, traffic control, and any other necessary work to complete the project.