Specifications include, but are not limited to: MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; CONSTRUCTION STAKES, LINES & GRADES 1.000 EA; TRAFFIC CONTROL 1.000 LS; CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS; REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 213.000 SY; REMOVAL & DISPOSAL OF EXISTING CONCRETE 23.000 CY; UNCLASSIFIED EXCAVATION 1,254.000 CY; MAINTENANCE STONE 55.000 TON; LIQUID ASPHALT BINDER PG64-22 2.000 TON; DRIVEWAY PAVING-SURFACE TYPE C NON-RESURFACING PROJECT 28.000 TON; 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 250.000 LF; RELOCATION OF MOUNT.ASSEMBLY FOR FS.SIGN ON SPAN WIRE 3.000 EA; FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 40.000 LF; FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 80.000 LF; FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 20.000 LF; FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 225.000 LF...