Specifications include, but are not limited to: 1) Approximately 1.47 miles of placing and grading soil cement base including prime on Oscar Wynn Road. The contractor will be responsible for designing soil cement mix based on test sampling of subgrade. Project begins at paved intersection of Oscar Wynn and ends at Mt. Olive Road. Soil Cement base width is 26 feet and 6 inches in depth. Prime and sand. 2) Approximately 1.47 miles of triple surface treatment paving on Oscar Wynn Road using #5, #7, and #89 stones along with a Cationic Polymer Modified Rapid Curing Fog Seal. Fog seal shall be placed on project within one week of #89 stone placement. Project begins at paved intersection of Oscar Wynn and ends at Mt. Olive Road. Fog Seal applied at rate of .12 gallons per SY over top of #89 stone. Approximately 20,696 SY. Pavement width is 24 feet. Temporary center line striping and permanent 5 “center and edge striping...