The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents, including, but not limited to the following activities: Mill and overlay in parts of streets as detailed in the plans, installation of ¾” asphalt leveling course, installation of asphalt-rubber aggregate membrane (ARAM), installation of gap-graded asphalt rubber hot mix (ARHM), slurry seal, removal and replacement of concrete curb & gutter, sidewalks, ADA ramps, spandrels, driveways and cross gutters. Installation of 18” concrete pipe collar, concrete headwall, type G-2 inlet with grate. Furnishing and installation of new water service. Installation of thermoplastic striping, installation of Rectangular Flashing Beacon Assembly System and Pedestrian Hybrid Beacon, and furnishing and installation of landscape and irrigation. Includes road traffic control around the construction zones.