Specifications include, but are not limited to: 1. The awarded Contractor must be able to provide hot mix overlay as specified in this solicitation. 2. The project shall be defined by the road the work is located on. 3. The Contractor will be responsible for obtaining all permits required to complete the work as described in the bid documents. 4. All hand-held equipment and materials will be considered incidental to the work. 5. If dumping waste, a waste disposal agreement between the property owner and Franklin County Highway Department will need to be filled out and on file at the Franklin County Highway Department Office before removing any waste from the site. Using a known dump or recycler is exempt from this requirement. 6. One (1) week prior to beginning work, the Contractor shall notify the Highway Administrator of the tentative schedule. 7. Each day the Contractor will be responsible for informing the Highway Administrator or his duly appointed representative of the next day’s work. 8. A written Notice to Proceed shall be issued prior to the start of work. 9. Mobilization is defined, for the purpose of this contract, as the cost to move in, setup, teardown, and leave the site. Mobilization will be paid in one (1) lump sum as noted on the pricing sheet. 10. No work shall be performed between 3:30 pm on Fridays and 7:00 am on Mondays. No work shall be performed between 3:30 pm the day prior to a holiday and 7:00 am the day following a holiday. A list of County observed holidays may be provided upon request. 11. In accordance with the 2009 Manual of Uniform Traffic Control Devices, Section 6D.03 Worker Safety Considerations shall apply. Paragraph 04 contains the standard. 12. Specifications, with MoDOT Sections listed, are from the Missouri Department of Transportation (MoDOT) Standard Specifications for Highway Construction 2018 and all supplemental specifications and will govern the work performed (including testing) where applicable. In all MoDOT Sections, the Franklin County Highway Administrator or his duly appointed representative will be substituted for Construction and Materials and the Commission. 13. Asphalt Cement Price Index MoDOT Section 109.15