Specifications include, but are not limited to: 1. PASSIVE AIR ROOF VENT REPLACEMENT: EXISTING PASSIVE AIR ROOF VENT TO BE REMOVED. 2. ROOF ASSEMBLY REPLACEMENT: SHADED REGION INDICATES EXISTING ROOFING ASSEMBLY TO BE REMOVED TO EXISTING METAL ROOF DECKING SUBSTRATE BELOW, AND NEW ROOFING INSTALLED. ALL DEBRIS IS TO BE REMOVED FROM THE SITE. SEE SPECIFICATIONS FOR EXTENT OF DEMOLITION AND SITE CONSTRAINTS. 3. RIGID CONDUIT REPAIR (VIF): INDICATES EXISTING RIGID CONDUIT RUNS EXPOSED ON EXISTING ROOF, CONTRACTOR SHALL MAKE VISUAL INSPECTIONS ON SITE TO VERIFY THE EXTENT OF WORK WHICH BE REQUIRED TO MOVE AND RELOCATE THESE CONDUIT RUNS DURING THE PROCESS OF RE -ROOFING AND TO ENSURE THAT THE NEW ROOF SLOPES ARE INTEGRATED AND ACCOUNTED FOR WHERE EXTENSIONS OF THESE CONDUITS AND WIRING IS REQUIRED. 4. ROOF CURB REPLACEMENT: ALL EXISTING ROOF CURBS TO BE REMOVED AND REPLACED IN AREAS BEING RE -ROOFED. 5. ROOF DRAIN REPAIR (VIF): APPROXIMATE LOCATION OF EXISTING ROOF DRAIN, CONTRACTOR SHALL VISUALLY INSPECT ALL CONDITIONS REPLACE DAMAGED COMPONENTS AND ADJUST TO NEW ROOF SLOPE. 6. FLASHING VIF: SEE DETAILS FOR FLASHING AND COUNTERFLASHING WHICH IS TO TIE INTO THE EXISTING BUILDING ENVELOPE. VERIFY CLEARANCES AND LOCATIONS FOR INSTALLATION OF ALL FLASHING AND TERMINATION BARS AS DETAILED. 7. RUNNER CURB INSTALLMENT: PROVIDE NEW “RUNNER CURBS ” FOR SUPPORT OF ALL HARD PIPING WHICH IS TO REMAIN ON ROOF AFTER NEW INSTALLATION. SPACE CURBS AS REQUIRED SO CONDUIT AND PIPING DOES NOT SAG BETWEEN THESE LOCATIONS. INSTALL AS DETAILED. 8. ROOF EXPANSION JOINT REPAIR (VIF): INDICATES APPROXIMATE AREA AND LOCATION OF ROOF EXPANSION JOINT. CONTRACTOR SHALL VISUALLY INSPECT THE EXISTING CONDITIONS AT THE SITE AND PROVIDE A NEW EXPANSION JOINT AS DETAILED WITHIN THESE DOCUMENTS. THE INSTALLER SHOULD ASSUME THAT ALL EXISTING WOOD BLOCKING SHALL BE REPLACED WITH NEW TREATED WOOD BLOCKING AS PER DETAILS. PROVIDE NEW CANT STRIP, FLASHING, PRE -FINISHED EXPANSION JOINT COVER, VINYL BELLOWS, AND BASE FLASHING AS DETAILED. VERIFY EXACT ROUTING AND AREA WHERE THIS EJ IS TO BE REMOVED AND REPLACED, VERIFY ALL EXISTING CONDITIONS, ESPECIALLY ANY PIPING, AND CONDUIT WHICH MIGHT INTERSECT OR CROSS OVER THIS JOINT. 9. PLUMBING VENT REPLACEMENT (VIF): CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING ROOFING PLUMBING VENTS WHICH ARE TO REMAIN. CONFIRM HEIGHTS OF VENT PIPING AND EXTEND WHERE REQUIRED DUE TO INSTALLATION OF NEW TAPERED INSULATION. EXTEND ALL VENTS AS REQUIRED TO MAINTAIN VERTICAL CLEARANCES CALLED FOR ON EACH RELATED CONSTRUCTION DETAIL. REPLACE ALL LEAD VENT & PIPE FLASHING. TYPICAL ALL LOCATIONS. 10. FLASHING REPLACEMENT: REMOVE AND REPLACE FLASHING, COUNTER - FLASHING AND PRE -FINISHED METAL FASCIA FLASHING AS DETAILED. 11. SKYLIGHT REPLACEMENT: INSTALL NEW ALUMINUM SKYLIGHT GUARD TO MATCH EXISTING. 12. HVAC REPAIR (VIF): INDICATES EXISTING HVAC EQUIPMENT AT EXISTING ROOF WHICH IS TO REMAIN. COORDINATE WORK INVOLVED WITH THIS