Specifications include, but are not limited to: 0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 240 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 5 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 120 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 180 0009 120120 TYPE III BARRICADE EA 3 0010 120165 CHANNELIZER (SURFACE MOUNTED) EA 14 0011 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 180 0012 120320 TEMPORARY BARRIER SYSTEM LF 200 0013 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0014 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8 0015 014105 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 1 0016 130100 JOB SITE MANAGEMENT LS LUMP SUM 0017 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0018 130560 TEMPORARY SOIL BINDER SQYD 2,000 0019 130570 TEMPORARY COVER SQYD 150 0020 130640 TEMPORARY FIBER ROLL LF 1,000