Specifications include, but are not limited to: • Evaluating Water Board approved Trash Capture device that will successfully capture trash from runoff. The trash capture device will be designed to meet the hydraulic design criteria as required under the Municipal Permit for Stormwater (MRP 3.0). • Developing a minimum of two conceptual design options for installation of the trash capture device and provide supporting analysis for preferred option that maintains current capacity. The consultant will be required to provide conceptual level cost estimates for each option and provide expected annual maintenance costs for each option. • Develop Basis of Design report that summarized alternatives evaluated and recommendations for a preferred alternative. • Perform land survey services necessary for design. • Identify and document utilities within the project area and any necessary modifications and/or relocations to accommodate the preferred alternative. • Complete the environmental review and approval process. • Obtain required permits from regulatory agencies to allow for construction of the improvements. • Prepare cost estimate for construction of the evaluated options. The cost estimates will include but not be limited to cost of acquiring and installing the preferred trash capture device. Cost estimated will be required for: conceptual design, 60% design, 90% design, and final design. • Provide an estimate of annual maintenance costs for the preferred option.