Specifications include, but are not limited to: Work will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installment of new pavement, excavation for pavement base repair for approximately 8.33 miles of streets, installation of Asphalt Concrete with Aramid Fiber, raising appurtenances and survey monuments to grade, night work, sweeping, installation of curb ramps to meet ADA requirements, sidewalk panel removal and replacement, curb and gutter removal and replacement, cross gutter removal and replacement, commercial driveway replacement, relocation of pedestrian push buttons, installation of new pedestrian push buttons and push button posts, removal and replacement of pedestrian barricades, tree trimming, root pruning, tree removal, weed abatement, weed spraying, replacing traffic striping/markings/ markers/devices, replacing vehicle detector loops and stubs, traffic control drawings and Caltrans permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City.