Specifications include, but are not limited to: The contractor(s) shall provide, at a minimum, labor pricing for the following tasks, individually. All the necessary materials, including Dispensers, piping and Fuel Management System have been ordered separately by the Town. Tasks, not exclusive; Demo existing u/g and install new flexible piping – see sheet FS.02 (ex. 2" dia APT DW UL 971) Trenching as per the signed and sealed drawings – FS.04, FS.07, FS.10 (if necessary) and FS.13 for reference only Install submersible pumps at the AGT area (ex: 3/4HP connect into sumps via 2"dia SCH 40 BLK ST pipe) – see FS.02 and installation dwg(s) install sumps and dispensers with equipment install one (1) Unleaded Wayne IX two hose dispenser and one (1) Diesel Wayne IX two hose dispenser – FS.02 and installation dwg(s) Install one (1) EVO Fuel Management System Install electrical – FS.10 and FS.13 Start up, training and warranty, with live transactions, running reports and interfacing with the current Town’s a/c system.