1. Site: a. Site grading, embankment, and bituminous pavement b. Gas, electrical, water utilities c. Final certified survey 2. Brine Building: a. Slab on grade foundation b. Wood frame construction c. Mechanical/ plumbing systems d. Water service installation e. Gas and electric service connections f. Metal roofing and siding. 3. Salt Storage Shelter a. Construction of a nominal 80’-0” wide by 90’-0” long fabric covered steel framed building system, either truss arch or pre-engineered metal frame: includes engineering analysis, design and construction of foundation, concrete piers, and fabric covered steel framed system, including precast bunker panels. b. Engineering analysis and design. 1) Complete analysis and design within 30 days of the Notice to Proceed. 4. Covered Bins a. Precast bunker panels with wood framing. b. Metal roofing and siding.