Specifications include, but are not limited to: 1. Review Drawings and Specifications to be certain that all functional requirements, as described, can be achieved with equipment to be supplied. 2. Provide Submittals as specified. 3. Coordinate and confirm final and precise layout of PARCS equipment, mounting structures, conduits, stubs, and anchor bolts with Owner prior to installation. 4. Attend construction meetings, provide schedules as requested, and schedule fieldwork to be coordinated with Owner. 5. Provide and install all PARCS equipment as described and specified. 6. Provide and install mounting structures necessary for the PARCS equipment. 7. Provide and install all software, ancillary components, and materials to provide a complete and functioning PARCS and the interconnection with any Owner supplied equipment. 8. Provide, install, terminate, and connect all necessary communications wiring and conduit required for the PARCS. 9. Provide, install, terminate, and connect any power conditioning that is required for the operation of the system. 10. Comply with all applicable codes and standards. 11. Authorize and accept responsibility for application of power to equipment and initiation of operation. 12. Run all initial diagnostics and system testing necessary to provide a complete working system. 13. Participate in system commissioning as required herein. 14. Test equipment a specified. 15. Provide as-built drawings, operating manuals, maintenance manuals, as specified. 16. Provide training as specified. 17. Remove and dispose of existing PARCS in accordance with applicable laws and codes. 18. For any PARCS components or equipment being removed that are within scope of the PCI-DSS as defined in the most-current version of the standard, securely dispose of such components or equipment using techniques described in the standard (PCI-DSS Section 9.8 and its subsections, or as revised). 19. Provide warranty services as required.