Specifications include, but are not limited to: Work to be performed includes, Work to be performed includes, but is not limited to: installation of storm drain pipe bank consisting of 4-12" PVC pipes, 24” PVC storm drain, junction structures, inlets, paver turnaround, swale grading, water and sewer lateral adjustment, utility coordination, sewer abandonment, storm drain decommissioning, asphalt paving, traffic control, Best Management Practices, compliance with regulatory permits, establishing vegetation on areas disturbed by construction activity, and all other work as described in the Contract Documents, including, without limitation, project construction drawings, bid documents, Special Provisions, City of South Lake Tahoe Public Improvements and Engineering Standards, and 2023 edition of California Department of Transportation, Standard Specifications.