Specifications include, but are not limited to: • Remove existing roof shingles down to bare wood. • Install ½” CDX plywood on the entire roof surface. • Install Grace Ice and Water Shield on all plywood. • Install cedar breather over the entire roof surface. • Install copper drip and rake edge around the perimeter of the roof. • Install 5/8” taper-sawn blue label CCA red cedar shingles at 5-1/2” exposure using #316 stainless steel nails. • Install 20 oz. copper ridge cap • Remove existing V Gutters and hanger brackets • Install Gutter Hanger Brackets • Install gutters to match existing V Gutters with 1”x4” – 1”x6” PVC (approximately 100 ft. of gutter) • Install a copper strip with 2”, revealing it 10’ down from the ridge to prevent algae growth. • All rubbish is to be cleaned and hauled from the property. • The contractor shall keep the work area neat at the end of each workday and keep it contained throughout the duration of the job.