Specifications include, but are not limited to: Provide all necessary materials, labor, and equipment to complete the installation of new asphalt shingles on the Academy Building as follows: • Remove existing roofing to bare wood and load it into a roll-off container located on site. The Town of Westbrook will bear the cost of container removal. • Inspect the entire roof deck for rot and/or deterioration. • Replace plywood as necessary using ½”, 4-ply CDX exterior grade plywood. Include cost per sheet, including installation of the Bid Response sheet (Attachment A). • Install new aluminum drip edge to all rake and drip edges. The color shall be white. • Install flashing tape to all plywood seams. • Adhere ice and water barrier membrane to 100% of the exposed roof area. • Install starter shingles to all eave and rake areas. • Supply and install new GAF Timberline HD lifetime architectural shingles, or equal, with stainless steel nails. • Install new neoprene flashing to all plumbing pipes. • Secure low pro ridge vent. • Install hip and ridge shingles to ridges. • Clean and secure the gutters following project completion. • The contractor shall keep the work area neat at the end of each work day and keep it contained throughout the duration of the job.