The work encompassed in this contract includes replacement of existing traffic signal controllers in existing cabinets, replacement of traffic signal cabinets on existing foundations, installation of field monitoring units, integration of traffic signal controllers with specified traffic management software, installation of 360 degree video detection systems, and associated work for four intersections along Post Road (US Route 1) in Warwick, eight intersections along Bald Hill Road (Route 2) in Warwick, five intersections along County Road (Route 103) in Barrington, three intersections along Main Street (Route 114) in Warren, and four intersections along Hope Street (Route 114) in Bristol. Not every signalized intersection encompassed within the project limits will require each item listed prior, and requirements for each intersection are depicted in the contract plans.