Specifications include, but are not limited to: Description: The Work will consist of: THE COUNTY OF SANTA CLARA PARKS AND RECREATION TENANT IMPROVEMENTS WILL HOUSE THE COUNTY'S PARKS AND RECREATION ADMINISTRATIVE STAFF. THE WORK WILL RETROFIT THE FIRST AND PARTIAL SECOND FLOOR OF AN EXISTING 46,700SF, CONCRETE TILT-UP PANEL, SINGLE STORY, HIGH BAY BUILDING FOR USE AS THE ADMINISTRATIVE BUILDING FOR PARKS AND RECREATION. THIS REQUIRES UPGRADES TO THE BUILDING, THAT INCLUDES NEW SYSTEMS AND EQUIPMENT. THE EXISTING STRUCTURE IS TWO STORIES, THE ROOF FRAMING IS WOODPANELIZED SYSTEM COMPRISED OF SUB-PURLINS AND BEAMS SUPPORTED ON STEEL COLUMNS, THE SECOND FLOOR IS A CONCRETE OVER METALDECK WITH STEEL OPEN WEB JOISTS/GIRDERS AND STEEL BEAMS SUPPORTED ON STEEL TUBE COLUMNS OR CONCRETE WALLS. THE BUILDING IS A COLD SHELL CONSTRUCTED IN 2000 WITH THREE EXISTING OPEN STAIRS, AN ELEVATOR, A LOADING DOCK, AN ELECTRICAL ROOM, AND A MPOE ROOM. THE SECOND FLOOR WILL REMAIN VACANT UNTIL FURTHER NOTICE. THE GROUND FLOOR INCLUDES A MAIN ENTRANCE LOBBY, OFFICES, WORK STATIONS, CONFERENCE ROOMS, BREAK AREAS, RESTROOMS, SHOWER FACILITIES, SECONDARY ENTRIES, STORAGE/SHIPPING AND RECEIVING AREA, SUPPORT SPACES, AND AN ADDED TRAINING CENTER. THE BALANCE OF THE BUILDING IS TO BE RESERVED AS WARM SHELL FOR FUTURE TENANCY. THE PROJECT IS DESIGNED TO BE NET ZERO ENERGY FACILITY AND LEED CERITFIED WITH NATURAL VENTILATION WITH IMPROVED MECHANICS, ELECTRICAL, AND PLUMBING.