Specifications include, but are not limited to: he following areas are to be crack filled, coated, repaired and striped. 1. The entire lot is to seal coated including the entrances from Ford St and 9th St. 2. The restriping shall be the same layout as before coating including all arrows and hashes, any changes must be approved by the Austin Peay Physical Plant. 3. Attached is a map of the general location where the work is to be completed. Specifications: 1. All cracks in the asphalt shall be cleaned of debris and filled with crack filler prior to seal coating. 2. Seal coating should be oil and gasoline resistant. 3. Seal coat should be two coats, each applied separately 4. Parking lot is to be striped in white paint. Marking shall include handicap spaces with blue and white paint with the dynamic, international icon. 5. Work shall be completed no later than August 16th, 2024. A proposed schedule of work must be submitted with the bid. 6. Some work may need to be completed on the weekends or nights due to availability.