Specifications include, but are not limited to: The Contractor shall haul the vessel out on a suitable dry-dock or graving dock. The vessel shall be held on dry-dock for a sufficient time to allow for completion of all necessary underwater hull work as required by these specifications. The Contractor is to provide all necessary tugboats for shifting, cranes and other equipment essential to the shifting, docking and undocking of the vessel. The vessel is to be shifted on the blocks for cleaning and painting of the entire underwater portion of the vessel. All necessary services including but not limited to the following shall be provided: Shore power (at 208V), fresh water, and sanitation line and trash disposal. The contractor shall provide a safe and convenient means of boarding the vessel at all times. Ladders for boarding will not be permitted. Because of the U.S. Coast Guard inspection, there must be a minimum 3’ of clearance under the keel of the vessel. The contractor shall survey the hull, draft a new docking plan allowing for the locations of the grid coolers, and provide two (2) hard copies and one (1) digital copy to the LADOTD Representative.